What we do

  • Own and operate an exempted 1000MW electricity interconnector through the Channel Tunnel
  • Deliver a net social benefit of ~€640m over the life of the interconnector
  • Achieve cross border flows with low environmental impact resulting from the use of zero overhead lines or under sea cables
Innovative use of the Channel Tunnel enables a low environmental impact project
1000MW of merchant interconnector capacity
A safe system based on proven technology

Description of project

Graphic1 Click to expand

ElecLink responds to the need for greater electricity interconnection which can:

Physical characteristics

Operating performance

Environmental impact

Project location

Graphic1 Click to expand

ElecLink connection

Health and safety