European network codes

Terms and Conditions or Methodologies

Approved versions

CACM 15(1)
Capacity Calculation Regions
01 April 2019
CACM 16
Generation and Load Data Provision Methodology
13 May 2016
CACM 17
Common Grid Model Methodology
27 May 2016
CACM 20
Channel Capacity Calculation Methodology
27 September 2018
CACM 35(1)
Channel Methodology for Coordinated Redispatching And Countertrading
23 November 2018
CACM 35(1)
Channel Methodology for Coordinated Redispatching And Countertrading - Explanatory Note
23 November 2018
CACM 43
Day Ahead Scheduled Exchanges
01 December 2018
CACM 43
Day Ahead Scheduled Exchanges - Explanatory Note
01 December 2018
CACM 44
Channel Fallback Procedures
25 May 2018
CACM 45 and 57
Multiple Nemo Arrangements FR
10 October 2016
CACM 45
Day Ahead Multiple Nemo Arrangements GB
12 December 2016
CACM 55
Intraday Pricing
24 January 2019
CACM 57
Intraday Multiple Nemo Arrangements GB
12 December 2016
CACM 59
Intraday Cross–Zonal Gate Opening and Intraday Cross-Zonal Gate Closure Times
26 April 2018
CACM 69
Day-Ahead Firmness Deadline
27 October 2016
CACM 69
Day-Ahead Firmness Deadline - Explanatory Note
27 October 2016
CACM 73
Congestion Income Distribution
14 December 2017
CACM 74(1)
Channel Methodology for Coordinated Redispatching And Countertrading Cost Sharing
23 November 2018
FCA 17
Generation and Load Data Provision Methodology
23 May 2017
FCA 18
Common Grid Model Methodology
09 June 2017
FCA 31
Amended Channel Regional Design LTTRs
15 December 2017
FCA 36
Amended Channel LT Nomination Rules
17 April 2019
FCA 49 and 59
Single Allocation Platform Establishment and Cost Sharing
07 April 2017
FCA 49 and 59
Single Allocation Platform Establishment and Cost Sharing - Explanatory Note
07 April 2017
FCA 51
Harmonised Allocation Rules
29 October 2019
FCA 52
Amended Border Specific Annex to the Harmonised Allocation Rules
29 November 2019
EBGL 19
Replacement Reserve Implementation Framework
18 June 2018
EBGL 20(1)
Manual Frequency Restoration Reserves Implementation Framework
24 January 2020
EBGL 21(1)
Automatic Frequency Restoration Reserves Implementation Framework
24 January 2020
EBGL 25(2)
Standard Products for Balancing Capacity
17 June 2020
EBGL 29(3)
Classification Methodology for the Activation Purposes of Balancing Energy Bids
16 July 2020
EBGL 30(1)
Methodologies for Pricing Balancing Energy and Cross Zonal Capacity used for the Exchange of Balancing Energy or Operating the I mbalance Netting Process
24 January 2020
EBGL 40(1)
Methodology for a Co optimised Allocation Process of Cross Zonal Capacity
17 June 2020
EBGL 50(1)
TSO TSO Settlement Rules for the Intended Exchange of Energy
16 July 2020
EBGL 52(2)
Harmonisation of the Main Features of Imbalance Settlement
15 July 2020
EBGL 50(4)
Asynchronously Connected TSO TSO Settlement Rules for the Intended Exchange of Energy
27 March 2020
EBGL 51(2)
Asynchronously Connected TSO TSO Settlement Rules for the Unintended Exchange of Energy
18 June 2019
SOGL 40
Key Organisational Requirements Roles and Responsibilities
01 October 2018
SOGL 40
Key Organisational Requirements Roles and Responsibilities - Explanatory Note
01 October 2018
SOGL 67(1) and 70(1)
Common Grid Model Methodology
12 February 2018
SOGL 76
Channel Regional Operational Security Coordination (ROSC) Methodology
21 December 2019
SOGL 84
Methodology for Assessing the Relevance of Assets for Outage Coordination
19 June 2019
SOGL 75
Methodology for Coordinating Operational Security Analysis
19 June 2019
CEP 36
Definition of System Operation Regions (SOR)
6 April 2020
RPR 8
Methodology for Short term and Seasonal Adequacy Assessments
6 March 2020
RPR 5
Methodology for Identifying Regional Electricity Crisis Scenarios
6 March 2020

Previous versions

CACM 15(1)
Capacity Calculation Regions
30 June 2017
CACM 15(1)
Capacity Calculation Regions
17 November 2016
CACM 44
Channel Fallback Procedures
14 December 2016
CACM 59
Intraday Cross–Zonal Gate Opening and Intraday Cross-Zonal Gate Closure Times
24 April 2018
CACM 73
Congestion Income Distribution
29 June 2016
FCA 31
Channel Regional Design LTTRs
17 April 2017
FCA 36
Channel LT Nomination Rules
13 October 2017
FCA 51
Harmonised Allocation Rules
10 April 2017
FCA 51
Harmonised Allocation Rules
17 November 2016
FCA 52
Border Specific Annex to the Harmonised Allocation Rules
17 April 2017
FCA 52
Border Specific Annex to the Harmonised Allocation Rules
07 February 2019